m***m 发帖数: 67 | 1 I walked-in at 03/15 for an 03/29 FP appointment at Long Island ASC.
Today -
1 day after original FP date, the AP/EAD approved online.
BTW: SRC129017****
PD: 02/2009
RD: 02/21/2012
AP/EAD: 03/30/2012
TSC | c*********o 发帖数: 714 | | s*******r 发帖数: 3429 | | o**o 发帖数: 148 | 4 应该无关的 我的ead/ap 3/17 还没FP 给约到了 04/17
【在 m***m 的大作中提到】 : I walked-in at 03/15 for an 03/29 FP appointment at Long Island ASC. : Today - : 1 day after original FP date, the AP/EAD approved online. : BTW: SRC129017**** : PD: 02/2009 : RD: 02/21/2012 : AP/EAD: 03/30/2012 : TSC
| b********7 发帖数: 12906 | 5 not even remotely connected. i got EAD/AP approved before FP, and received
EAD/AP on the same day of FP.
FP is for 485 only. |
|