由买买提看人间百态

boards

本页内容为未名空间相应帖子的节选和存档,一周内的贴子最多显示50字,超过一周显示500字 访问原贴
CivilEngineering版 - 土木的春天要来了
相关主题
这个冬天有点冷,公司开始裁人了有没有关于seismic design example的书?
Anyone in FLR NJ office?谁做过 Certificate of "No Rise“ Determination
建筑口的人就是野 (转载)出了我心爱的JEC
请帮忙推荐一下 高层结构设计的经典教材吧。油工,说说你那个Bra吧。
关于FEMA 178 中结构的分类,怎么翻译?美国没有砖混结构、底JNPR 10K reading
有弯区的朋友么?Cbi 能不能作为长线选择?
Wind load in ASCE 7-10 is ultimate load那只股票是修大桥的?
大家来讨论一下木结构的SMF支撑问题政府再次敦促民众做好灾难准备,'僵尸要来了‘
相关话题的讨论汇总
话题: obama话题: plan话题: repair话题: since话题: largest
进入CivilEngineering版参与讨论
1 (共1页)
b*******g
发帖数: 1095
1
8马说要大规模修桥补路
http://www.bloomberg.com/apps/news?pid=20601087&sid=aBcPiaRqqffg&refer=home
Obama Plans Largest Building Program Since 1950s (Update1)
Email | Print | A A A
By Hans Nichols
Dec. 6 (Bloomberg) -- President-elect Barack Obama said he’ll make the “
single largest new investment” in roads, bridges and public buildings since
the Eisenhower Administration to lift the sagging economy and create jobs.
Obama, in his weekly radio speech today, said his plan to create or preserve
2.5 million jo
h**e
发帖数: 410
2
你当美国是天朝啊!
w*********g
发帖数: 26
3
didn't see "bridge" in whole report
l****1
发帖数: 52
4
其他版本有提到修路,根据他的竞选计划,有70b修路,最新计划至少100b用于修路。现
在的公路系统已经半个世纪前规划的,延伸和改造都是时候了。我相信这个计划会
通过。
另外,infrastructure计划除了道路,还要建学校,医院,水处理设施等等,都少不了
土木
。该轮到土木火一把了, 赫赫

【在 w*********g 的大作中提到】
: didn't see "bridge" in whole report
w*********g
发帖数: 26
5
hope so
。现
y******r
发帖数: 2986
6
我就学习道路
希望可以等到这个春天
现在太冷了

since
preserve

【在 b*******g 的大作中提到】
: 8马说要大规模修桥补路
: http://www.bloomberg.com/apps/news?pid=20601087&sid=aBcPiaRqqffg&refer=home
: Obama Plans Largest Building Program Since 1950s (Update1)
: Email | Print | A A A
: By Hans Nichols
: Dec. 6 (Bloomberg) -- President-elect Barack Obama said he’ll make the “
: single largest new investment” in roads, bridges and public buildings since
: the Eisenhower Administration to lift the sagging economy and create jobs.
: Obama, in his weekly radio speech today, said his plan to create or preserve
: 2.5 million jo

x***d
发帖数: 227
7
hope so,

【在 y******r 的大作中提到】
: 我就学习道路
: 希望可以等到这个春天
: 现在太冷了
:
: since
: preserve

l****1
发帖数: 52
8
Stocks of civil engineering companies are crazy today,
JEC, FLR, URS....you name it.
J****7
发帖数: 375
9
土木的春天真的要来了!
m****e
发帖数: 1956
10
!!!what a piece of great news!
相关主题
有弯区的朋友么?有没有关于seismic design example的书?
Wind load in ASCE 7-10 is ultimate load谁做过 Certificate of "No Rise“ Determination
大家来讨论一下木结构的SMF支撑问题出了我心爱的JEC
进入CivilEngineering版参与讨论
E********w
发帖数: 102
11
Looks like most of work would be repair or maintenance, at least in 2009. It
will benefit Mexicans for sure, but hard to say for consultants and
engineers.
The real Spring may be the Spring of 2010. Wish everybody would survive the
brutal 2009.
w*********g
发帖数: 26
12
Dude,
It is not about repairment, it is about upgrading the house for energy
saving.
Do you understand what it is?

It
the

【在 E********w 的大作中提到】
: Looks like most of work would be repair or maintenance, at least in 2009. It
: will benefit Mexicans for sure, but hard to say for consultants and
: engineers.
: The real Spring may be the Spring of 2010. Wish everybody would survive the
: brutal 2009.

E********w
发帖数: 102
13
The key of this stimulus plan is to create 2.5 million jobs in a very short
time, and only ready-to-go construction work can do it. Design of any major
project will easily take more than a year, and only need a handful of
engineers.
The first money will go to repair and upgrade bridges, roads, and sewer
system, which primarily need labors. If you read the plan, upgrading
government buildings is only a small portion of it.

【在 w*********g 的大作中提到】
: Dude,
: It is not about repairment, it is about upgrading the house for energy
: saving.
: Do you understand what it is?
:
: It
: the

h***g
发帖数: 337
14
There is definitely a lot of work for engineers if the plan is approved.
Either repair or upgrade of infrastructures will require extensive engineeri
ng design. Firstly, it requires a detailed survey of the existing condition.
Then, the proposed work will be documented including every single bolt that
will b
e used. For example, there will be even more work to repair a bridge than to
build a new one because of traffic control issues, sometimes complicated ph
ase/stage plan if the bridge is in a

【在 E********w 的大作中提到】
: The key of this stimulus plan is to create 2.5 million jobs in a very short
: time, and only ready-to-go construction work can do it. Design of any major
: project will easily take more than a year, and only need a handful of
: engineers.
: The first money will go to repair and upgrade bridges, roads, and sewer
: system, which primarily need labors. If you read the plan, upgrading
: government buildings is only a small portion of it.

h***g
发帖数: 337
15
In term of design process, it may take a while, but it can speed up signific
antly if money is here. Some FEMA repair projects moved really fast in my co
mpany and we did not take
shortcuts.

short
major

【在 E********w 的大作中提到】
: The key of this stimulus plan is to create 2.5 million jobs in a very short
: time, and only ready-to-go construction work can do it. Design of any major
: project will easily take more than a year, and only need a handful of
: engineers.
: The first money will go to repair and upgrade bridges, roads, and sewer
: system, which primarily need labors. If you read the plan, upgrading
: government buildings is only a small portion of it.

E********w
发帖数: 102
16
The plan will be approved without any question, and hopefully it would bring
back the good times as in 2005 and 2006 for everybody in this industry.
My point was that you might not see it until the second half of 2009 or
early 2010. And also your firm needs to know government clients very well.
Wish everybody a very happy new year and Merry Xmas!

engineeri
condition.
that
to
ph
they

【在 h***g 的大作中提到】
: There is definitely a lot of work for engineers if the plan is approved.
: Either repair or upgrade of infrastructures will require extensive engineeri
: ng design. Firstly, it requires a detailed survey of the existing condition.
: Then, the proposed work will be documented including every single bolt that
: will b
: e used. For example, there will be even more work to repair a bridge than to
: build a new one because of traffic control issues, sometimes complicated ph
: ase/stage plan if the bridge is in a

h***g
发帖数: 337
17
呵呵,没有反驳你的意思,我的帖子就我所知道的给大家提供
一点信息。
对于公共设施维修,不是说像自家房子漏了,找个老墨来修屋
顶就好了。那样的确只给低级劳工力提供机会。
公共设施的维护要有详细的调查,计算,施工方案,监督,验收。
有人问了,维修也要图纸计算?是的,维修不是刷油漆,刷错了
没事。有很多加固,扩建,比新建还麻烦。不然出了事故,桥踏
房倒,关系人命,出一起就够受的,那时找包工头也没有用。这个
投资计划估计有10-20%给工程设计,然后建材,施工设备公司,
土建施工公司直接受益。我觉得老墨拿的倒是少数。

bring

【在 E********w 的大作中提到】
: The plan will be approved without any question, and hopefully it would bring
: back the good times as in 2005 and 2006 for everybody in this industry.
: My point was that you might not see it until the second half of 2009 or
: early 2010. And also your firm needs to know government clients very well.
: Wish everybody a very happy new year and Merry Xmas!
:
: engineeri
: condition.
: that
: to

1 (共1页)
进入CivilEngineering版参与讨论
相关主题
政府再次敦促民众做好灾难准备,'僵尸要来了‘关于FEMA 178 中结构的分类,怎么翻译?美国没有砖混结构、底
杜阮加入勇士新闻发布会视频有弯区的朋友么?
Jack Bauer Stripped His ClothesWind load in ASCE 7-10 is ultimate load
普度Han教授的收入大家来讨论一下木结构的SMF支撑问题
这个冬天有点冷,公司开始裁人了有没有关于seismic design example的书?
Anyone in FLR NJ office?谁做过 Certificate of "No Rise“ Determination
建筑口的人就是野 (转载)出了我心爱的JEC
请帮忙推荐一下 高层结构设计的经典教材吧。油工,说说你那个Bra吧。
相关话题的讨论汇总
话题: obama话题: plan话题: repair话题: since话题: largest