来自主题: CivilEngineering版 - 请教诸位一个问题
我从research角度说说吧,实际设计,我没做过,但是我对steel connection有过很深
的研究(呵呵,吹牛呢)。
beam-to-column connection,传递弯矩的主要分fully restrained and partially
restrained connection. 还有Reduced Beam Section (RBS)。你说的那个pin-
connection,到实际应用的时候,shear 传递是靠column web和 beam web之间的
friction. 这里所说的column web是指shear tab welded to the column flange.
Without welding between beam and column flanges, the moment can be
transfered by that two bolts when there is no relative displacement between
the shear tab and beam webs. However, those re
R**********n
发帖数: 1109
2
来自主题: CivilEngineering版 - Discussion: Difference between wall and column.
Dear Friends:
Sorry I can not input Chinese from this computer. My boss gave me half of a
day to do some research and tell him what is the difference between column
and wall (I think he meant shear wall, not retaining wall). He ask me to
research it from structural engineering view instead of geometrical view.
What come to my mind is: column mainly support axial compression force and
governed by compression; shear wall mainly support lateral force and
governed by shear.
Could you give me some su
d********y
发帖数: 1141
3
来自主题: CivilEngineering版 - 有人上过Steven 的seismic design review课吗?
1)
Given soil site class : D
Seismic design catergory: D
Sds=0.49
W = known
T=0.04
What is V?
2) given occupancy classification
Ss=1.5
S1=1
Site classification: B
W is known
T=1
Min CBC seismic design load force=?
3) CBC requires special inspection of the 2 story includes the additional
inspection of the concrete placement of?
4) interior steel
Fv
deflection 8"
An exterior wall system
What is the drift?
5) initial structure damage is ?
7) most common failure pre1970 is what?
8) snow load
Wind l... 阅读全帖
n******n
发帖数: 1030
4
可不可以cut WF beam and weld it to base plate?
这个不是常规做法,可能要多算算PLATE bending, shear, block shear以及bolt
tension & shear.

grout
w******r
发帖数: 43
5
来自主题: Macromolecules版 - how to do polymer alignment?
The easiest way is to use channel die to shear it. If you want to align it
completely, you can use plate shear under certain frequence. You can design
the
mold by yourself. You can also control the temperature during the shearing
process.
B*******e
发帖数: 111
6
来自主题: Macromolecules版 - Entanglement of polymers
请问在polymer melts状态下, entanglements是否可能在shear作用下disentangle. 特
别是在interface.如果是的话,这个disentanglement的critical shear rate是否对应
shear-thinning 的拐点? 有没有直接的手段来证明这些.

orientation,
c*******n
发帖数: 1648
7
Suppose I have a shear thinning liquid flowing in a complex geometry
as a pressure flow。Is the viscosity the same everywhere regardless diff。
shear rate everywhere?How to justify this from math?
Furthermore,if I have two components in the flow,
one is more viscous than the other, how to justify the less viscous one
always goes to high shear rate region?THANK YOU!
j***n
发帖数: 1471
8
来自主题: ME版 - 请教个旋转流的模拟问题
你这个问题有点意思。我是这么看的,这实际上是一个shear-driven flow,如果环内
流体要以某个角速度旋转,那么只要摩擦系数够高,摩擦力够大,内外环壁面附近的流
体就能保证足够的线速度维持你所给你的角速度。但是远离避免,夹在内外环中间的那
些流体,他们的线速度完全来自于shear,如果粘度不够大,产生不了足够大的shear,
那这些流体就无法维持足够大的线速度来满足你指定的角速度,这能解释为什么你要给
一个足够大的粘性才能有合理的解。
假设你的流体是无粘性的,那么我认为你看到的可能就是内外环壁面附近有少量流体因
为摩擦力而旋转,中间大部分流体根本不动。
w*******y
发帖数: 60932
9
643-279 046561-191481 Vigoro Anvil Lopper
783-942 845049-003250 Centurion Titanium Pruning Shears Bonus Pack -
10" Blade length Hedge Shears & 5/8" cutting capacity Bypass Pruner
329-977 845049-003670 Centurion Titanium Hedge shear & Lopper set
w********9
发帖数: 8613
10
来自主题: Military版 - 惊讶于德国人的英语能力
这是Shorter Oxford American English Dictionary第五版列出的与德语或者日耳曼语
相关的英语词根或词汇。
-at, suffix2. + -dom, suffix. + -ed, suffix1. + -ed, suffix2. + -en, suffix1
+ -en, suffix2 + -en, suffix5 + -en, suffix6 + -er, suffix1. + -er, suffix3
. + -er, suffix5. + -est, suffix1. + -est, suffix2. + -et, suffix2. + -eth,
suffix1. + -hood, suffix. + -ing, suffix1. + -ing, suffix3. + -ish, suffix1.
+ -kin, suffix. + -le, suffix1 + -le, suffix3 + -less, suffix. + -ling,
suffix1. + -ling, suffix2 + -ly, suffix1. + -ly, s... 阅读全帖
l******a
发帖数: 3803
11
来自主题: USANews版 - 搅屎棍Obangma开始转移注意力了
我坚信,垂汪当总统都比它爸强。
虽然,垂汪可能把economy打得满脸是血。
Obama Focuses on Economy, Vowing to Help Middle Class
Stephen Crowley/The New York Times
Obama Speaks in Illinois: The president spoke about the country’s economic
progress and his vision for the rest of his presidency.
By MICHAEL D. SHEAR and PETER BAKER
Published: July 24, 2013 612 Comments
WARRENSBURG, Mo. — President Obama tried to move past months of debate over
guns, surveillance and scandal on Wednesday and reorient his administration
behind a progra... 阅读全帖
h******7
发帖数: 980
12
来自主题: Automobile版 - 大家看这个想法可行吗?
3000kg的车,在45°的斜坡上,如果用不锈钢做小细轴,shear modulus=79.3Gpa(参考
wiki,
shear modulus中的表格),如果截面是正方形,细轴长20cm,正方形的边长只要6cm就
可以保证不会
断掉,边长8.5cm就可以在其余条件相同的情况下支撑6000kg的车,所以在上下坡上应
该没有问题。
进出curb的速度不会太快,所以动力就可以很大,一般的curb方向的倾斜应该也还好。
下雪是个大问题,要好好考虑考虑。
w*l
发帖数: 754
13
来自主题: Automobile版 - 安全性能最差的豪华车
America’s Most Dangerous Luxury Cars
August 15, 2012 by Mike Sauter
More than 10,000 people are killed each year in front-end crashes in the
United States. While most cars offer protection in front-end accidents,
overlap crashes, where the car is not hit head-on, are a different matter
entirely. Until now overlap crashes, which account for nearly one in four of
the front-end crashes involving serious or fatal injury to front seat
occupants, have not been tested by the government or other indepen... 阅读全帖
l*****r
发帖数: 990
14
首先,Gurson model 不能很好模拟剪切模式,加不加nucleation都一样,这是老夫20
年前就有的理解,并不是从你那里学来的。
用 I1–J2–J3 来描述压力相关的金属剪切带很早就有,你并不是第一个。我觉得这个
insight真的很一般,我大约20年前就知道。举几个比你早10年金属剪切带的例子:
Lee YK and Gosh J. (1999). THE SIGNIFICANCE OF J3 TO THE PREDICTION OF SHEAR
BANDS, International Journal of Plasticity, Vol. 12, No. 9, pp. 1179-1197.
Brunig (1999, 2001) and Brunig et al. (2000) have studied numerically the
effect of hydrostatic stress sensitivity on shear-band development in iron-
based high-strength metals, using general... 阅读全帖
m******i
发帖数: 9479
m***y
发帖数: 14763
16
来自主题: Living版 - poured basement 是很大的优点吗?
Again, I sense there might be a confusion with the terms we are using. When
I say 地基, I mean the foundation wall and footing. I'm not talking about
the floor, because unless it's a slab, it doesn't bear any load at all. Even
for slab, the shear stress is negligible (again, expect for CA), and thus
not so much need for steel reinforcement. But for foundation walls, the
reinforcement (steel or non-steel) gotta be there, because concrete can't
handle the shear stress.
p**********g
发帖数: 9558
17
来自主题: Living版 - 今天去看了Diablo的锯片
其实买80 teeth就对了
The Diablo 10 in. x 90 Tooth Ultimate Flawless Finish Circular Saw Blade
features Perma shield nonstick coating to help protect the blade from heat,
gumming and corrosion. Precision shear point helps provide flawless finishes
. 90 Teeth. For cutting wood.
For use with miter or table saws
Carbide construction
Ultra-thin kerf design for easy cuts
Shear-face grind design delivers effortless cuts with a reduced amp draw
on tools for less material waste and to help maximize... 阅读全帖
j******3
发帖数: 5244
18
amazon, search thinning shear or thinning scissors.
I have just bought one and it works well although it is a bit expensive.
here is the link:
http://www.amazon.com/Tweezerman-Stainless-2000-Thinning-Shears/dp/B000WHWIWO/ref=pd_bxgy_hpc_img_b
good luck!
S*****n
发帖数: 766
19
从Central Boulevard可以顺利右转斜穿进入Sheare Avenue
因为那边的道路在改动,地图不可能是准确跟进的
Sheare Avenue两个方向的车道分开这么大,实际是并排挨着的
反正你开车过去觉得没问题,只是某些时段,这个ERP非常贵
第二张图,非常熟悉,大概看了有三年时间,每天都看
不过,第一次意识到MCE没有左转进入ECP的
MCE主道进出KPE,一条匝道进入ECP的樟宜方向,一条匝道接受来自樟宜方向的车辆
有点意思,不知道当初的线路布置时候,怎么考虑的
f******n
发帖数: 4
20
Updated:
If interested, please call 765-491-3309
http://tippecanoe.craigslist.org/gms/2512469386.html
Bathroom Rack: $3
White Rack: $1/each
Kettle: $2
http://tippecanoe.craigslist.org/gms/2509836725.html
Two Layer Case ( below the TV in picture): $ 3
Hanging Organizer: $ 2
White Rack: $1
Hangers : $ 1 for 4 wood hangers, $ 1 for 10 plastic hangers
http://tippecanoe.craigslist.org/gms/2509846068.html
Cordless Phone: $ 2
Photo/Picture Frame:
Vacuum Filter (new): $ 5
http://tippecanoe.craigslist.or... 阅读全帖
n********g
发帖数: 14
21
来自主题: SanDiego版 - 8月广告--房屋出租/求租
Nice single furnitured room in a 2b2b condo for rent
Sheared with a 3 member family (4 year old boy)
In UTC area, close to Vons and Dolye park.
Close to UCSD shuttle and bus station.
$750/month, including meals.
shear 1/3 utility (including electricity and internet)
room will be available from Dec 18
looking for a quiet, clean and easy going roommate
Long and short are lease OK
No smoking and no pets please.
如有兴趣,请站内联系。
M*******n
发帖数: 1165
22
多谢各位了,没有打过猎,正在积极搜寻工具中
http://www.midwayusa.com/viewProduct/?productNumber=237043?cm_c
This kit includes all the tools you need to process game. It includes a 3"
caping knife, 4-1/4" gut-hook skinning knife, 5-1/2" boning/filet knife, 8"
bowie style butcher knife, bone saw, brisket spreader, carving fork, cutting
board, game shears, game cleaning gloves, carrying case and a tungsten
carbide v-sharpener.
Technical Information
Contents:
# 3" caping knife
# 4 1/2" skinning knife
# 5 1/2" boning/file... 阅读全帖
s***a
发帖数: 4921
23
来自主题: Running版 - 今天跑步有人死了zz Singapore
Participant of Singapore Bay Run dies at end of 21km run
By Susheel Kaur and Foo Siew Shyan, Channel NewsAsia | Posted: 26 August 200
...
hrs
Photos 1 of 1
Defence Minister Teo Chee Hean at the flag-off of the SAFRA Sheares Bridge
Run &
Army Half Marathon
SINGAPORE: A participant of the Singapore Bay Run, also known as the SAFRA
Shear
es Bridge Run & Army Half Marathon, collapsed and died on Sunday morning.
25-year-old Captain Ho Si Qiu, a platoon commander at the Singapore Armed
Forces
Offic
x******n
发帖数: 8550
24
hhttp://gardening.about.com/od/maintenance/a/Spring_Pruning.htm
Suggested Perennial Plants to Prune in the Spring(A-D)
Artemisia Most Artemisia don’t like being pruned in the fall. The growth
that results is too tender to survive
the winter and the dieback is often enough to kill the whole plant. Clean in
early spring. (USDA Zones 5 - 9)
Asters Fall blooming asters have generally been pinched and forced several
times throughout the growing
season. Once they are finally allowed to bloom, they app... 阅读全帖
x******n
发帖数: 8550
25
M-Z
Mums (Chrysanthemum) Leave the foliage in tact to protect the plant’s crown
. All the better to let the flowers bloom well into the fall. (USDA Zones 5
- 9)
Oriental Poppy (Papaver orientale) Poppies appear to be ephemeral,
disappearing or declining after the blooms fade. However a new flush of
foliage should emerge and can be left on the plants over winter, to act as a
mulch. (USDA Zones 3 - 7)
Pincushion Flower (Scabiosa columbaria) You can remove the old flower stems,
but this plant is so... 阅读全帖
k****t
发帖数: 12697
26
来自主题: PhotoGear版 - 奔靴子, [FS] 卖靴子.
SEASON 结束, HEAVY DUTY 的USE 完了, 12月的EAGLE WATCH, 1月SKI TRIP都是LIGHT
USE. 所以BOOTS 都洗了洗干透了上了BOOT TREATMENT. 把鞋子整理一遍, 发现 1/3 的
鞋是BOOTS. 冏的是有几双买了好几年没动过TAG 还在.
奔. 除了灰的那个是FISHING BOOTS 不防水还有漏水的MESH,其他都是各种TEX, GORE
TEX, HYDRO TEX, CHIPA-TEX... 还有双JUSTIN 的WORK BOOTS 不属SPORTS 就不SHOW 了
顺便说说WALMART 卖的$60 - $100 的防水靴. HERMAN 的SURVIVOR 系列做工防水都还
不错, 不过比起好牌子, FIT 好象总有问题, SIZE/WIDTH 明明都对, 穿上去总是没有
那种人靴一体的感觉. 要求不高也可以.
======================================================
卖靴子:
多了双CHIPPEWA 9", 7,8年前买的, 当时觉得巨好听说意大利的S... 阅读全帖
U***t
发帖数: 98
27
来自主题: BUAA版 - Re: A380 center fuselage
你说的是对的,fuselage的(in-plane)shear buckling是个很重要的一个设计要求,
以前有过B707(可能有误)fuselage的shear failure例子,飞机倒是降落了,
不过成了敞篷飞机,吹走了几个乘客,呵呵。Diameter大的fuselage应该
更容易buckling(with identical shell thickness),所以需要增强,这又导致
重量的大幅增加,所以可能会导致结构的重新设计,难度也因此而增高。
其实doubledeck的设计是很聪明的,因为增加的deck的重量可以另一方面增强fuselage
的刚性,一石二鸟啊。。。
c*******n
发帖数: 1648
28
这个有意思,看着有道理,但是。。。。
物理有个东西天天用,就是外推到极限,看看还是不是对。
现在假设在阿里呀那海沟上游泳,算深度无穷大。SHEAR RATE无穷小,那不是SHEAR
STRESS无穷小?哪位达人点解?

rate)
a***k
发帖数: 27
29
来自主题: NJU版 - 公元1999年10月1日零时整
公元1999年10月1日零时整,新加坡国立大学SHEARES HALL 各个BLOCK陆续响起装严
的中华人民共和国国歌声,住在SHEARES HALL的中国学子齐放国歌,歌声传遍国立
大学肯特岗南面的校园以及临近的其他HALL。大家随身在海外,都心怀祖国。
M****e
发帖数: 70
30
来自主题: Biology版 - Re: 请教蛋白保存问题
cystal of ice will form that can mechanically shear the protein.
the same as DNA. for storage of DNA, it is better to be stored
in buffer to avoid such mechanical shearing and hydrolysis,
if you concern about EDTA, you can use Tris-HCl (pH 8.0).
Here is some general guide for storage of purified proteins:
For short term storage (up to 24 h), most proteins can be kept
at 4C. For storage times longer than 24 h r at 4C, it may be
necessary to filter sterilize the protein preparation (through
a 0.22
t**********8
发帖数: 223
31
来自主题: Biology版 - 请教一个chip的问题
我想买一个enzymatic shearing的kit试试,用来替代sonication,因为我要chip的
complex太大,sonication效果很不好。但实验室另一个postdoc认为enzymatic
shearing会把dna切得太小,会miss掉很多东西,他认为这个方法只适合chromatin
modification。
很纠结,不知道是否值得一试。
g*********5
发帖数: 2533
32
来自主题: Biology版 - 核蛋白的Co-IP的 Protocol
Isolation of nuclei for the co-IP and whole ChIP protocols is based on the
methods of Gendrel et al. (2002, 2005), Johnson et al. (2002), and Nelson et
al. (2006).
METHOD
For extraction and co-IP of nuclear proteins, see Steps 1-39 (Fig. 1). For
the ChIP procedure, see Steps 40-69 (Fig. 2).
Figure 1.
View larger version:
In this page
In a new window
Figure 1.
Flowchart for the timeline and organization for co-IP of nuclear proteins
from Arabidopsis seedlings.
Figure 2.
View larger versio... 阅读全帖
f*******e
发帖数: 354
33
size selection也可以在建库完成后。如果用的是hi seq,1kb也没有什么问题。传统
的用truseq kit建rna seq库,一般是没有必要size selection的,镁离子化学断裂非
常的好。chipseq ip的大小一般会比input大一点,如果是sonication shear的不好的
话,ip下来的片段就可能会大很多,但是mnase digestion好的话的基本pattern不会变
,也就是如果超声shear的好的话确实不需要选择,因为大片段本来就不多。测序时到
flow cell 上cluster的时候也就都丢了,无所谓。


: 你说的很对,recommended的protocol都是size selection。但是我们的
facility坚持

: 认为没必要,他不size selection,测序前library跑的bioanalyzer是个100bp
到1kb的

: 宽峰…

: 怎么说服他做size selection?

: 话说为什么size selection 保真度更高?

: [在 yier... 阅读全帖
f****n
发帖数: 67
34
【 以下文字转载自 Macromolecules 讨论区 】
发信人: funren (funren), 信区: Macromolecules
标 题: 请教VISCOMETER和rheometer的区别
发信站: BBS 未名空间站 (Mon Oct 4 20:52:02 2010, 美东)
G'和G"能不能用VISCOMETER来测,用来测一种蛋白hygrogel,
我现在只有VISCOMETER,可以得到RMP,mPa,shear stress,shear rate,torque的数
据,但不知道这些数据有什么用,
那位高人解答一下啊,谢谢,
G*******E
发帖数: 72
35
来自主题: CivilEngineering版 - 有geotech的吗,请教问题

So you think 20 DS will be cheaper than 1 CU?
Typically, cost wise, 2 DS = 1 CU.
So you think 10 CU will be less reliable than 20 DS?
BTW: It does not make sense to compare DS with CU, because DS is hard to
control drainage and shear area. At least, I don't trust shear strength
results from DS for clay.
Don't understand. What do you mean "高的土的强度参数"? and why "没有人愿意承
担高的风险"?
n**********b
发帖数: 114
36
来自主题: CivilEngineering版 - 请教诸位一个问题
No.
The rotation is proportional to the moment and depends on the stiffnes of
that section. Normally without the displacement between shear tab and beam
web, the rotation is very tiny. When the moment is larger than the capacity
of that pin connection, the bolts or the shear tabs or the beam web might
fail. And it is a little complicated and depends on the beam section.
wheel (Would you hold still ? Please) 的大作中提到: 】
n**********b
发帖数: 114
37
来自主题: CivilEngineering版 - Discussion: Difference between wall and column.
I am curious what your boss major is? why this funny question.
Your feeling is almost right in the shear-wall building and most other type
of buildings. However, in the moment-resisting frame building (steel or
concrete) without shear walls, the columns also provide the lateral
resistance and may be controlled by that.
Hope it would help.

a
R**********n
发帖数: 1109
38
来自主题: CivilEngineering版 - Design of Frame Members in a Building
Thanks for Mingforever.
The lateral load resisting system is concrete shear wall. If follow my
supervisor's direction, I am concerned that the some columns/beams might
collapse in an earthquake even though the whole building will not collapse (
since the shear wall is strong enough.)
Dick

and
t******o
发帖数: 467
39
来自主题: CivilEngineering版 - Design of Frame Members in a Building
For rigid diaphram building, lateral loads distribution will be based on
stiffness. Typically your concrete shear walls will have relatively much
higher stiffness then other beams/columns. Therefore, concrete shear walls
will take 100% lateral loads for design purpose.
Your supervior is correct.

loads
not
effect
b*******g
发帖数: 1095
40
来自主题: CivilEngineering版 - 请教问题:结构工程interview
Q's I used to ask entry level applicants on concrete:
M and V diagram for a simply supported or a fix-end beam?
M and V diagram for a 5-span continuous beam?
Given the M and V diagram above, how to lay out reinforcement?
Given the M and V diagram above, where is the critical section for one-way
shear?
How to design flexural reinforcement for a square spread footing?
If all above are answred correctly, I would ask about two-way slab and
punching shear. But it seems that these are "advanced topics
j***h
发帖数: 4412
41
来自主题: CivilEngineering版 - 请问在国内工作过的朋友
PK is used for RC MRF analysis and design only. They have another product
called SATWE for RC shear wall or dual system analysis and design. Here is
an advertisement the guy published on an ASCE proceeding:
Proceedings / TALL BUILDING ANALYSIS AND DESIGN
A CAD Program for Tall Buildings—SATWE
ASCE Conf. Proc. doi:10.1061/40513(279)33
Computing in Civil and Building Engineering (2000)
Proceedings of the Eighth International Conference on Computing in Civil and
Building Engineering
Yungui Li
Pr... 阅读全帖
Z****g
发帖数: 13731
42
来自主题: CivilEngineering版 - 有人上过Steven 的seismic design review课吗?
风载的传力是 外墙->slab->shear wall -> foundation
你对受力的顺序可能理解不对

shear
Z****g
发帖数: 13731
43
来自主题: CivilEngineering版 - 有人上过Steven 的seismic design review课吗?
风载的传力是 外墙->slab->shear wall -> foundation
你对受力的顺序可能理解不对

shear
Z****g
发帖数: 13731
44
来自主题: CivilEngineering版 - two way slab concrete moment frame
moment frame - look at slab's out-of-plane flexural/shear
diaphram - look at slab's in-plane flexural/shear

frame
T**9
发帖数: 1528
45
来自主题: CivilEngineering版 - two way slab concrete moment frame
是东部的结构,并且还没有大风的地方吧。 slab 当moment beam 多厚啊.
你的 slab 都满足 moment frame 了, 也满足punch shear 和moment shear transfer
了, diaphragm 验算也会是 trivial 的,肯定大大超过demand.

frame
r*********5
发帖数: 61
46
就是那个PE推荐人申请表,其中一栏是Description of Engineering Tasks & Duties
。一下是我写的英文内容和相应的中文翻译,请专业英文好的大大们看一下,写的是否
准确,谢谢啦!
Structural design, including structural form selection and evaluation,
design enhancing, seismic design and calculation, overall structural
calculation, structural element and foundation calculation, computer results
assessment. The completed projects includes concrete structure(including
frame structure, frame-shear wall structure, and shear wall structure);
steel structure; wood structure... 阅读全帖
w********e
发帖数: 7186
47
来自主题: CivilEngineering版 - 桩筏基础计算
staad.foundation only checks two way shear, doesn't check one way shear on
slab.
Staad is more popular, Etabs is only for building design.
s********r
发帖数: 565
48
来自主题: CivilEngineering版 - 桩筏基础计算
问题是slab类型的结构是否需要check one way shear? 似乎puncture shear和bending
moment会control....
f*******g
发帖数: 167
49
来自主题: CivilEngineering版 - 身上挂个Ph.D.真是个大累赘
谢谢,我看了一下,pushover analysis还真不会,需要学习。我现在只会做一些简单
的design, 比如用ASCE7和CBC算base shear force,然后design wood shear wall,
steel frames 之类的。总之都是一些residential的小job。基本上还是以PE的seismic
exam的那本绿皮书为基础进行的学习。

ASCE
s*******y
发帖数: 946
50
来自主题: CivilEngineering版 - 大偏心的工字钢插入混凝土基础计算
参考以下组合结构的设计要求吧。 就是那种,比如钢梁加shear stud的设计。
然后在校核以下punching shear, pull out strength之类...反正可能的荷载都考虑到
就是了。
首页 上页 1 2 3 4 5 6 7 8 9 10 下页 末页 (共10页)