明天起的两个星期向西走新桥,向东走旧桥。
After the first weekend closure:
Westbound traffic will travel on the new
floating bridge.
Eastbound traffic will travel on the old
floating bridge.
The transit stop at Evergreen Point Rd.
will remain closed for at least two weeks.
具体日程表看 http://www.wsdot.wa.gov/NR/rdonlyres/F8E05309-7D6F-4A83-801F-A6
A*********l 发帖数: 2005
2
旧520最后会拆掉吗?
【在 t********s 的大作中提到】 : 明天起的两个星期向西走新桥,向东走旧桥。 : After the first weekend closure: : Westbound traffic will travel on the new : floating bridge. : Eastbound traffic will travel on the old : floating bridge. : The transit stop at Evergreen Point Rd. : will remain closed for at least two weeks. : 具体日程表看 : http://www.wsdot.wa.gov/NR/rdonlyres/F8E05309-7D6F-4A83-801F-A6