re-graded the slope away from the house
re-waterproofed the foundation
installed 4 brace posts in the north wall
2 brace posts in the east wall
tuck-pointed mortar joints
added reinforcement (including rerod concrete) to the finished portion of
basement wall for the window area
removed exterior face of block in 4 areas and reinstalled
grouted cores with mason mic
installed rod in core
请大家帮忙看看有多大问题