T**J 发帖数: 3340 | 1 确切的说是1720lb,然后还去lowes又搬回来720lb,估计也就是1/2的需要量。 | R**R 发帖数: 3318 | 2 HD 可以租绊水泥的,个不大,一次两三袋,电动的,我用过,很方便。
【在 T**J 的大作中提到】 : 确切的说是1720lb,然后还去lowes又搬回来720lb,估计也就是1/2的需要量。
| g*****9 发帖数: 4125 | 3 What are you building? It is cheaper to have the concrete company deliver
them.
For a small job, I usually notify the driver, they will dump the left over
fresh concrete in the mixer on the way back from a job site. $20 for them,
save me the hassle of mixing myself, I build one section at a time, so this
is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a
time. The bad part is color does not match perfectly, but I can live with
that.
【在 T**J 的大作中提到】 : 确切的说是1720lb,然后还去lowes又搬回来720lb,估计也就是1/2的需要量。
| m***y 发帖数: 14763 | 4 //nod.
If you need more than a shovel, the delivery is cheaper by volume.
this
【在 g*****9 的大作中提到】 : What are you building? It is cheaper to have the concrete company deliver : them. : For a small job, I usually notify the driver, they will dump the left over : fresh concrete in the mixer on the way back from a job site. $20 for them, : save me the hassle of mixing myself, I build one section at a time, so this : is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a : time. The bad part is color does not match perfectly, but I can live with : that.
| c****o 发帖数: 32446 | | h********y 发帖数: 3778 | 6 Gee,老大,你总能给些很有创意的省钱的点子
我拿小本记下啦。
this
【在 g*****9 的大作中提到】 : What are you building? It is cheaper to have the concrete company deliver : them. : For a small job, I usually notify the driver, they will dump the left over : fresh concrete in the mixer on the way back from a job site. $20 for them, : save me the hassle of mixing myself, I build one section at a time, so this : is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a : time. The bad part is color does not match perfectly, but I can live with : that.
| T**J 发帖数: 3340 | 7 40多1天,比水泥还贵。
【在 R**R 的大作中提到】 : HD 可以租绊水泥的,个不大,一次两三袋,电动的,我用过,很方便。
| T**J 发帖数: 3340 | 8 竖post呢,每天也就需要700、800磅,量太小。
this
【在 g*****9 的大作中提到】 : What are you building? It is cheaper to have the concrete company deliver : them. : For a small job, I usually notify the driver, they will dump the left over : fresh concrete in the mixer on the way back from a job site. $20 for them, : save me the hassle of mixing myself, I build one section at a time, so this : is perfect. I build a lot of side walk that way at 2 to 3 cubic yard at a : time. The bad part is color does not match perfectly, but I can live with : that.
|
|