m********9 发帖数: 116 | 1 Compared to the completed contract method of revenue recognition, will the p
ercentage-of-completion method most likely result in higher:
Total assets? Liabilities?
a. No No
b. No Yes
c. Yes No
d. Yes Yes |
j**********g 发帖数: 241 | 2 I choose A. The only difference is revenue recognition period. |
c*w 发帖数: 4736 | |
m********9 发帖数: 116 | 4 revenue recognition就影响到AR呀,所以会影响到total asset呀,是不是percentage
-of-completion method的AR高呢?答案不是A哎
【在 j**********g 的大作中提到】 : I choose A. The only difference is revenue recognition period.
|
m********9 发帖数: 116 | 5 请问怎么分析呢?revenue recognition好像只影响asset吧?那么liability怎么影响
呢?
【在 c*w 的大作中提到】 : c?
|
c*w 发帖数: 4736 | 6 recognized revenue will be added into asset.
partial recognize is more than no recognize.
so it means possibly more asset.
liability no change.
【在 m********9 的大作中提到】 : 请问怎么分析呢?revenue recognition好像只影响asset吧?那么liability怎么影响 : 呢?
|
m********9 发帖数: 116 | 7 多谢啊,可是答案解释是这样的:
Compared to the completed-contract method, the percentage-of-completion meth
od will most likely result in higher total assets, reflecting the accrual of
gross profit during the contract period and lower liabilities, as the highe
r level of construction-in-progress provides a larger offset to advance bill
ings.
我可以理解accrual of gross project 所以资产较高,但是不理解为什么负债较低?我
也认为负债不影响啊,但是解释是说lower liabilities, as the higher level of co
nstruction-in-progress provides a larger offset to advance
【在 c*w 的大作中提到】 : recognized revenue will be added into asset. : partial recognize is more than no recognize. : so it means possibly more asset. : liability no change.
|
c*****9 发帖数: 97 | 8 因为在FS上的表达是
当advance billings大於construction-in-progress
advance billings减除construction-in-progress 列於负债
因为percentage-of-completion method依据完工比例认列利益在onstruction-in-
progress 这个科目下 所以construction-in-progress 在percentage-of-completion
method下 金额会比completed-contract method大 所以负债就小了 |
m********9 发帖数: 116 | 9 非常感谢!
是不是advanced billing是负债类科目?怎么会出现advanced billing大于 CIP 的情况
呢? 记账不是:
Dr CIP
Cr advanced billing吗?
所以我觉得他们应该是一样的呀
另外:完成合同法应该没有advanced billing吧?
哎,学会计的时候这个没有仔细学呀!
多谢指教啊!
completion
【在 c*****9 的大作中提到】 : 因为在FS上的表达是 : 当advance billings大於construction-in-progress : advance billings减除construction-in-progress 列於负债 : 因为percentage-of-completion method依据完工比例认列利益在onstruction-in- : progress 这个科目下 所以construction-in-progress 在percentage-of-completion : method下 金额会比completed-contract method大 所以负债就小了
|
y*****2 发帖数: 2435 | |
c*****9 发帖数: 97 | 11 我不考CFA 我就是个吃饱闲着沒事的过路人 :P
以前不考 现在不考 以后更不会考
是不是advanced billing是负债类科目?是的
怎么会出现advanced billing大于 CIP 的情况
呢? 记账不是:
Dr CIP
Cr advanced billing吗?
分录不是这样的
收取工程款时是
借 cash
贷 advanced billing
跟CIP一点关系也没有
所以有时候是可能提前多收的 看合同规定
工程完结转时才是
借 advanced billing
贷 CIP
否则这两科目不可能做一起的
另外:完成合同法应该没有advanced billing吧?
还是有的 没先收点钱谁要做啊 看你合同怎定 这跟采用什麽方法一点关系也没有 |